
Hove House
Reduction in carbon emissions over Part L1
2.08 tons p.a.
Energy generated on site
14.3% through LZC technologies
14.3% through LZC technologies
Services
Predicted water cost saving over Part G p.a.*
£138
NuPlanet were appointed to provide building compliance services on this 5-bedroom house designed by Turner Works in collaboration with Baobab Developments. Set around a central swimming pool and landscaped courtyard space, a wildflower roof improves thermal comfort and enhances site biodiversity.
SAP and water calculations were carried out during the building regulation and construction phases with air & sound testing post construction.
This project went on to win a RIBA South East Award.
*Calculated using Southern Water 2024/25 water tariff.



Images courtesy of Baobab Development and Jim Stephenson
