CGI close up showing 2 large residential blocks to each side. The blocks are brick build with balconies with a small garden area between them

Newtown Road, Hove

Reduction in carbon emissions over Part L1

124.9 tons p.a.

Services

Predicted water cost saving over Part G p.a.*

£11,323

Set over three blocks, this mixed-use development created much needed office space and 148 residential dwellings repurposing a former car dealership site close to Hove Station. 

NuPlanet were appointed to undertake a BREEAM pre-assessment and provide an energy and sustainability strategy. Overheating analysis was undertaken to demonstrate TM59 and TM52 compliance which was then used to develop the final ventilation strategy.

*Calculated using Southern Water 2024/25 water tariff.

CGI showing 2 large residential blocks to each side with a smaller block in the distance. The blocks are brick build with balconies with a small garden area between them
Aerial CGI showing a large residential high risedevelopment comprising 2 blocks with green roofs with a small garden area to the front

Images courtesy of Yelo Architects and Nicholas Dexter Design

Architect

Yelo Architects